- Present at meeting:
- Allan Rudwick
- Brad Baker
- Andrew Champion
- Jason Cohen
- Ali Sadri
- Thomasina Gabriele
- Bob Gravely
Legacy Discussion (Represented by Ali Sadri and Thomasina Gabriele)
- Prior City IMP requirements vs. new City campus zoning requirements going into effect end of 2023.
- Legacy interaction with ENA will be the same, requirements same.
- Yearly meetings with neighborhood.
- Legacy has no plans for future development at Emanuel outside of the (now mostly completed) Kerby St. building.
- Kerby St. building is not going to be occupied with tenants until end of 2022 at least.
- Parking is not being used either.
- Kerby St. building is not going to be occupied with tenants until end of 2022 at least.
- Discussion about setback requirements—no major change here with transition from IMP to new campus zoning.
- Legacy cannot build any significant height near sidewalk.
Kerby RFP
- General sentiment of support from Legacy representatives.
Pacific Power (Represented by Bob Gravely)
- PP is headed toward demolition of Knott St. building.
- Putting out bid for demolition
- Brick crumbling, lead paint, asbestos.
- Graffiti removal.
- Substation no longer housed inside.
- PP is going to put more substation equipment in place of building.
- PP looking for ways to integrate with neighborhood—landscaping?
- Underground substation probably not an option.
- Discussion about sanctioned graffiti.
- Viewing site from satellite view—seeing lots of unused space. Discussion about parceling off unused land for retail, housing, park, etc.
- PP representative will look into this.
- PP representative will try and bring back some drawings to us.
Event District Parking
- Eliot up to Russell being included in parking study for event parking.
- Eliot will be included in next year’s N Portland parking study.
Lloyd meters 2 hrs. to 5 hrs.